In October 2007, some road workers were applying a hot patch to the South-West corner of Elgin and Somerset, presumably to cover the cracks and to reduce the depth of puddles that form there in rainstorms. According to the weather network, October 26 had a high of 15.8C and a low of 2C, and 4.4mm of precipitation. This photo was taken around 10:30 in the morning.
Here we can see them laying down the tar adhesive, painting it with a brush within a border made with a thinner brush:
I guess it must have rained that day, because that patch is long gone. By September '08, most of it was gone. In this photo, you can still see a little right at the corner of the sidewalk, and on the near side of the sewer grate. (Also note the old facade on the Scrim's Florist building)
No comments:
Post a Comment