Lifecycle of a pothole

The 2006-2007 reconstruction of Bank Street between Wellington and Laurier is the first major road reconstruction projects I photographed, albeit much less than subsequent ones. These multi-million-dollar reconstructions are designed to revitalize the underground infrastructure beneath our streets to last for decades to come. The surface situation can be a different story, however.

I took interest in one particular manhole cover at Bank and Slater, and took photos of it every now and then as I passed by the location on my bike, and so begins our story...

In June 2007, the sidewalks were finished and the tree pits installed outside the former location of the Shopper's Drug Mart in what is now called the Jack Layton Building. The roadway, meanwhile, was still in gravel:


In early September 2007, the first lift of asphalt was laid down. Of the stores visible in this photo, the Moores and the Money Mart are still there, the GNC and Blue Gardenia having closed since.